Skip to main content

Street Construction Updates (Street Beat)

 

Street Name Project DescriptionCurrent WorkContractorExpected CompletionTraffic / Parking RestrictionsProject Contact Information
ALL PUBLIC WORKS PROJECTSFOR MEDIA INQUIRES:    For all MEDIA INQUIRIES, please contact the City's Communications Bureau at 585-428-7135.
 FOR GENERAL CITY CONSTRUCTION INQUIRES NOT LISTED HEREIN: 

A&E Bureau Webpage
 
    For public works construction related questions that are not covered in this listing, please contact Andy Wojewodzic, Manager of Construction at 585-428-6523

2025 Residential M&R

(Various Streets)

The project consists of milling and resurfacing of the pavement, installation or upgrade of sidewalk curb ramps, replacement of pavement markings and signage, adjustments of manholes, catch basins and water valve boxes.

Update 05/30/25: Contractor to continue sidewalk removals and replacements the week of June 2nd, on the streets listed here... Lewis St, Fraser St, Rosewood Terrace, Greeley St, Parkside Ave, McKinister St, Denver St.

Contractor to mill and pave Berlin Street, St Jacob St, Wadsworth St and Hazelwood St the week of June 2nd.

Villager ConstructionFall 2025Daily lane and sidewalk closures and parking restrictions.See or call onsite Representative Gary Gates 585-370-9665, or call Matt Putnam, City Project Manager at 585-428-7494.
Brooks Avenue (Genesee Park Blvd. to Genesee St.)

Scope: Milling and Resurfacing of existing roadway, spot road base repair, spot curb, sidewalk and curb ramp repairs,  and roadway utility adjustments. In addition, new  traffic loops, pavement markings, and signs.

Project Webpage

Updated 05/30/25: Permanent pavement markings will be completed in summer.   


 
Ramsey Constructors / Nardozzi Companies (Water Work)Summer 2025 See or call on site representative Karen Montgomery 585-287-6898, or call 311.

Church Street / City Hall

(N. Fitzhugh St to Pindle Alley)

This project consists of the replacement of the existing brick sidewalk with new brushed concrete and exposed aggregate sidewalk; replacement of the existing curb including installation of new underdrain, curb access ramp, and milling and resurfacing of Church St.

Project Webpage

Updated 04/14/25: 

Sidewalk closures, pedestrian detours and parking restrictions began on Monday, April 7.

Project Updates

Nardozzi Paving and ConstructionFall 2025 See or call onsite Representative Jeremy Kimble 585-427-0320 x16, or call Andy Wojewodzic, City Project Manager at 585-428-6523.

Field office located at 80 Commercial St, Rochester, NY 14614.

Culver Road

(Monroe Ave to Atlantic Ave)

Work consists of milling of the existing pavement and placement of a new pavement top course for the entire project corridor. The project also includes miscellaneous fulll depth pavement repairs, replacement of broken or missing curb, hazardous sidewalk section replacement, upgrading sidewalk curb ramps to ADA standards and placement of new pavement markings.

Updated 05/30/2025: 

City contractor working on cycle track and curb ramps. Private utilities working throughout the project corridor as well.

Keeler ConsructionFall 2025Daily lane and sidewalk closures and parking restrictions.See or call on site representative Joe Mancini 585-286-9173, or call Matt Putnam, City Project Manager at 585-428-7494.
Durand Eastman Park Beach Site Improvements This project consists of improvements to the park and beach at Durand Eastman Park including trail repair, increased ADA accessibility, and improved beach access.Updated 05/30/25: Lake Ontario State Parkway Trail is closed from Lot A to Lot C.TME Excavating Corp.Summer 2025Trail closuresCall Tyler Burke, City Project Manager at 585-428-7571.
East Main Street (South Avenue to E Main St Bridge)This project consists of building an addition and envelope repairs to the Rochester Riverside Convention Center.Updated 05/30/25: Sidewalk and roadway shift in place through Summer of 2026. Pedestrian and Vehicular traffic will be maintained throughout the project. Javen ConstructionSummer 2026Main Street lane taken but traffic maintainedSee or call onsite Representative Jeff Buzzard 585-319-5341, or call Matt Putnam, City Project Manager at 585-428-7494.

Field office located at 16 E Main St, Suite 7, Rochester, NY 14614
Exchange Blvd. (Ford St to Basin St)

Work involves: Milling and Resurfacing of existing roadway, spot road base repair, spot curb, gutter, sidewalk and curb ramp repairs,  and roadway utility adjustments. In addition, new bicycle facilities, pavement markings, curb bump outs and mid-block crossings will be installed at select locations.

Project Webpage

Updated 05/30/25: City's contractor is working on Ford St. And Exchange Blvd. Sidewalk closures and temporary parking restrictions will be in place. Work on the intersection of Ford and Exchange has resumed.


 
Sealand ContractorsSpring 2025Daily lane and sidewalk closures and parking restrictions.See or call on site representative Lisa Barrett 585-363-5085, or call Matt Putnam, City Project Manager at 585-428-7494.

Fitzhugh Street / City Hall 

(Church St to Allen St)

This project consists of the replacement of the existing brick sidewalk with new brushed concrete and exposed aggregate sidewalk; replacement of the existing curb including installation of new underdrain, curb access ramp, and milling and resurfacing of Fitzhugh St.

Project Webpage

Updated 04/14/25: 

Sidewalk closures, pedestrian detours and parking restrictions began on Monday, April 7.

Contractor continues with sidewalk removals for Phase 1

Project Updates

Nardozzi Paving and ConstructionFall 2025Daily lane and sidewalk closures and parking restrictions.See or call onsite Representative Jeremy Kimble 585-427-0320 x16, or call Andy Wojewodzic, City Project Manager at 585-428-6523.

Field office located at 80 Commercial St, Rochester, NY 14614.
Genesee Street
(Scottsville Road/Elmwood Avenue to Brooks Avenue/South Plymouth Avenue)

Work involves: full depth reconstruction of the existing roadway; water main and water service; new drainage structures; curb; sidewalk; asphalt cycle track; signals; lighting; signing; marking; new trees.

Project Webpage

Updated 05/30/25: 

Paving operations to continue the week of June 2nd.

 

One-way detour expected to be in place till end of July 2025.

 

Ramsey ConstructorsFall 2025Daily lane closures and parking restrictionsSee or call onsite Representative Bill Heselton 585-721-4463, or call Matt Putnam, City Project Manager at 585-428-7494.

Field office located at 1200A Scottsville Rd, Rochester, NY 14624 
Park Avenue (Culver Rd to Oxford Street)

Work involves spot curb and sidewalk replacement, ADA curb ramps as well as catch basin installation, followed by milling & paving of the roadway.

A raised pedestrian crossing will be installed at Barrington Road and Buckingham Street after paving is complete.  

Updated 05/21/25: Villager Construction continues to work in the project corridor on various items.  Minor delays in traffic will occur throughout each workday between the hours of 7AM to 4PM.  Paving in this section is complete.  Utility adjustments will continue.  

Parking Notes

  • No parking zones will be designated by barrels and signs as needed.  
  • Your vehicle will be towed to an adjacent street/ lot if it is in violation of these temporary restrictions. If you think that your vehicle has been towed, please call 911 to locate it.
Villager ConstructionSummer 2025Daily lane shifts and parking closures.See or call onsite Representative Roger O'Toole 585-270-4227, or call Andy Wojewodzic, City Project Manager at 585-428-6523.

Field Office located at 277 Alexander St, Rochester, NY, 14607.
Park Avenue (Oxford Street to Alexander St)Work involves spot curb and sidewalk replacement, ADA curb ramps as well as catch basin installation followed by milling & paving of the roadway.

Updated 05/21/25: Villager Construction continues to work in the project corridor on various items including sidewalks, curb and ramps.  Minor delays in traffic will occur throughout each workday between the hours of 7AM to 4PM. 

Parking Notes

  • No parking zones will be designated by barrels and signs as needed.  
  • Your vehicle will be towed to an adjacent street/ lot if it is in violation of these temporary restrictions. If you think that your vehicle has been towed, please call 911 to locate it.
Villager ConstructionSummer 2025Daily lane shifts and parking closures.See or call onsite Representative Roger O'Toole 585-270-4227, or call Andy Wojewodzic, City Project Manager at 585-428-6523.

Field Office located at 277 Alexander St, Rochester, NY, 14607.
Pont de Rennes Bridge

Work involves structural repairs, bridge deck replacement, lighting replacement, railing modifications, and landscaping improvements.

Project Webpage

Updated 05/05/25:

Pont de Rennes Bridge is Open to Pedestrian Traffic

Contractor is completing final touchup and site feature installation is ongoing  on the bridge.

The bridge deck surface will undergo warranty repairs to the epoxy coating.  

Granite Mills Commons work is under construction with an anticipated completion in mid-summer 2025.


 

Cold Spring Construction CompanySummer 2025 (Granite Mills Commons) See or call onsite Representative Dan Frenette 716-442-5840, or call Tomas Andino, City Project Manager at 585-428-6535.

Field office located at 80 Commercial St, Rochester, NY 14614.
St Paul Street (Norton St to Tyler St)Work involves milling and resurfacing, spot curb and sidewalk replacement, curb ramp improvements, and adjustment and repair of manholes, catch basins, and water valve castings. Updated 05/05/25: Paving is complete.  Signal improvements remain at the corner of St Paul St and Norton St.Villager ConstructionSummer 2025Occasional shoulder closures and parking restrictionsSee or call onsite Representative Roger O'Toole 585-270-4227, or call Andy Wojewodzic, City Project Manager at 585-428-6523.

Field Office located at 277 Alexander St, Rochester, NY, 14607.
South Avenue (Broad St to Court St)This project consists of exterior rehabilitation and repair to the exterior masonry envelope of the Rundel Memorial Library.Updated 05/30/25: Sidewalk and roadway limited to two lanes through end of January 2026. DGA BuildersWinter 2025South Ave restricted to 2 lanes of traffic.See or call onsite Representative Rene Giannavola 585-333-6475, or call Roseanne Khaleel, City Project Manager at 585-428-6846.

Field office located at 50 South Avenue, Rochester, NY 14604.
South Plymouth Avenue (Genesee St to Ford St) 

Work consists of: Milling & resurfacing of asphalt pavement, reconstruction and relocation of curbs & sidewalk, repairs & adjustments to drainage basins, sewer manholes, and water service castings.  Surface drainage and ride quality will be improved.

Project Webpage

Updated 05/30/25: Final utility adjustments are underway.

 

 

Ramsey ConstructorsFall 2025Daily lane shifts, sidewalk closures and parking restrictionsSee or call onsite Representative Karen Mongomery 585-319-4835, or call Matt Putnam, City Project Manager at 585-428-7494.

Field office located at 130 West Main St. Suite 210, Rochester, NY 14608
State Street  (Inner Loop to Lyell AveWork consists of: Milling & resurfacing of asphalt pavement, reconstruction and relocation of curbs & sidewalk, repairs & adjustments to drainage basins, sewer manholes, and water service castings.  Surface drainage and ride quality will be improved.Updated 05/30/25: City's contractor to commence resurfacing operations the week of June 2nd.Sealand Contractors Corp.   Summer 2025Daily lane and sidewalk closures and parking restrictions.See or call on site representative Lisa Barrett 585-363-5085, or call Matt Putnam, City Project Manager at 585-428-7494.

University Avenue 

(N. Goodman St to Culver Rd)

Work consists of milling of the existing pavement and placement of a new pavement top course for the entire project corridor. The project also includes miscellaneous fulll depth pavement repairs, replacement of broken or missing curb, hazardous sidewalk section replacement, upgrading sidewalk curb ramps to ADA standards and placement of new pavement markings.

Updated 05/30/2025: 

City contractor working on the cycle track. Private utilities working throughout project corridor. 

Keeler ConsructionFall 2025Daily lane and sidewalk closures and parking restrictions.See or call on site representative Joe Mancini 585-286-9173, or call Matt Putnam, City Project Manager at 585-428-7494.
West Main Street
(Churchlea Pl to Cascade Dr / West Broad St)

Work consists of: Milling & resurfacing of asphalt pavement, reconstruction and relocation of curbs & sidewalk, repairs & adjustments to drainage basins, sewer manholes, and water service castings.  Surface drainage and ride quality will be improved.

Project Webpage

Updated 05/23/25: City's contractor is completing new pavement striping and punchlist items.

 

 

Ramsey Constructors Fall 2025Daily lane shifts, sidewalk closures and parking restrictionsSee or call onsite Representative Karen Mongomery 585-319-4835, or call Matt Putnam, City Project Manager at 585-428-7494.

Field office located at 130 West Main St. Suite 210, Rochester, NY 14608